Skip to content

Pull requests: pingcap/tidb

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

planner: Fixed point get not giving error on non-existing explict partition release-note Denotes a PR that will be considered when it comes time to generate release notes. sig/planner SIG: Planner size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#60399 opened Apr 4, 2025 by mjonss Loading…
1 of 13 tasks
executor: tiny optimize import into from select performance do-not-merge/needs-tests-checked release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#60397 opened Apr 3, 2025 by crazycs520 Loading…
13 tasks
planner: modernize some package lgtm release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#60396 opened Apr 3, 2025 by hawkingrei Loading…
1 of 13 tasks
disttask: distribute merge sort subtasks to all available nodes do-not-merge/needs-triage-completed release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#60395 opened Apr 3, 2025 by tangenta Loading…
1 of 13 tasks
infoschema,metrics: use tidb_tikvclient_request_seconds_bucket to get the .999 cop req duration instead (#59845) do-not-merge/cherry-pick-not-approved release-note-none Denotes a PR that doesn't merit a release note. size/S Denotes a PR that changes 10-29 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#60394 opened Apr 3, 2025 by ti-chi-bot Loading…
1 of 13 tasks
infoschema,metrics: use tidb_tikvclient_request_seconds_bucket to get the .999 cop req duration instead (#59845) do-not-merge/cherry-pick-not-approved release-note-none Denotes a PR that doesn't merit a release note. size/S Denotes a PR that changes 10-29 lines, ignoring generated files. type/cherry-pick-for-release-8.1 This PR is cherry-picked to release-8.1 from a source PR.
#60392 opened Apr 3, 2025 by ti-chi-bot Loading…
1 of 13 tasks
infoschema,metrics: use tidb_tikvclient_request_seconds_bucket to get the .999 cop req duration instead (#59845) do-not-merge/cherry-pick-not-approved do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. type/cherry-pick-for-release-7.1 This PR is cherry-picked to release-7.1 from a source PR.
#60391 opened Apr 3, 2025 by ti-chi-bot Loading…
1 of 13 tasks
infoschema,metrics: use tidb_tikvclient_request_seconds_bucket to get the .999 cop req duration instead (#59845) do-not-merge/cherry-pick-not-approved release-note-none Denotes a PR that doesn't merit a release note. size/S Denotes a PR that changes 10-29 lines, ignoring generated files. type/cherry-pick-for-release-7.5 This PR is cherry-picked to release-7.5 from a source PR.
#60390 opened Apr 3, 2025 by ti-chi-bot Loading…
1 of 13 tasks
[DNM]: optimize import into from select release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#60389 opened Apr 3, 2025 by crazycs520 Loading…
13 tasks
parser: Add support for DEFAULT ROLE option in CREATE and ALTER USER needs-ok-to-test Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#60386 opened Apr 2, 2025 by joshvarner Loading…
1 of 13 tasks
executor: tiny optimize import into from select performance release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#60384 opened Apr 2, 2025 by crazycs520 Loading…
1 of 13 tasks
planner: add enumeration of simple index join and complete it with indexJoinInfo built bottom-up ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#60383 opened Apr 2, 2025 by AilinKid Loading…
1 of 13 tasks
ddl: Non clustered reorg part optimistic backfill release-note Denotes a PR that will be considered when it comes time to generate release notes. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#60382 opened Apr 2, 2025 by mjonss Loading…
1 of 13 tasks
br: enhancements when BR update stats meta if tables have not statistic data release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#60376 opened Apr 2, 2025 by Leavrth Loading…
1 of 13 tasks
[WIP] planner: fast path to point get with prepared stmt do-not-merge/cherry-pick-not-approved do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#60367 opened Apr 2, 2025 by lance6716 Loading…
13 tasks
planner: recommend optimal plans in SHOW PLAN statement approved lgtm release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#60366 opened Apr 2, 2025 by qw4990 Loading…
1 of 13 tasks
importinto: fix error not returned when writing external meta (#60350) release-note-none Denotes a PR that doesn't merit a release note. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#60356 opened Apr 1, 2025 by GMHDBJD Loading…
1 of 13 tasks
*: inject random error for DXF (part2) release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#60354 opened Apr 1, 2025 by wjhuang2016 Loading…
1 of 13 tasks
go.mod: upgrade client-go to support redact log ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#60353 opened Apr 1, 2025 by tangenta Loading…
1 of 13 tasks
br: Pre-alloc all table ids for restore release-note-none Denotes a PR that doesn't merit a release note. size/XL Denotes a PR that changes 500-999 lines, ignoring generated files.
#60343 opened Mar 31, 2025 by RidRisR Loading…
2 of 13 tasks
tables: always append temp index values for unique index release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#60340 opened Mar 31, 2025 by tangenta Loading…
1 of 13 tasks
*: debug do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#60338 opened Mar 31, 2025 by fzzf678 Draft
13 tasks
planner: fix wrong HashAgg estrows for inner operator of index join (#60071) do-not-merge/cherry-pick-not-approved do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. release-note Denotes a PR that will be considered when it comes time to generate release notes. sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#60336 opened Mar 31, 2025 by ti-chi-bot Loading…
1 of 13 tasks
planner: add optimizer cost factors lgtm release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#60333 opened Mar 30, 2025 by terry1purcell Loading…
1 of 13 tasks
stmtsummary: change plan_hint column type to text ok-to-test Indicates a PR is ready to be tested.
#60331 opened Mar 29, 2025 by henrybw Loading…
2 of 13 tasks
ProTip! Adding no:label will show everything without a label.